Rakehead viaduct under construction. 15th January 1970.
The motorway, which was first proposed in the 1930s, and originally conceived as two separate routes, was opened in stages between 1971 and 1976, with construction beginning at Pole Moor and…
At the summit of the road between Ripponden and Littleborough. The notice on the board reads "Teas and Refreshments. Catering for public and private parties".
Dr Katrina Navickas in her 2009 article Northern History writes:
SD 91 SW MILNROW CLEGG HALL ROAD
(south side)
3/85
Clegg Hall
10/8/51
G.V.
II*
House. c.1610. For Theophilus Ashton. Dressed stone, hammer-dressed stone and graduated stone slate roof. 5 x 3 bays with 2 storeys (plus attic level) all raised above a…
SD 91 SW MILNROW CLEGG HALL ROAD
(south side)
3/85
Clegg Hall
10/8/51
G.V.
II*
House. c.1610. For Theophilus Ashton. Dressed stone, hammer-dressed stone and graduated stone slate roof. 5 x 3 bays with 2 storeys (plus attic level) all raised above a…
SD 91 SW MILNROW CLEGG HALL ROAD
(south side)
3/85
Clegg Hall
10/8/51
G.V.
II*
House. c.1610. For Theophilus Ashton. Dressed stone, hammer-dressed stone and graduated stone slate roof. 5 x 3 bays with 2 storeys (plus attic level) all raised above a…
SD 91 SW MILNROW CLEGG HALL ROAD
(south side)
3/85
Clegg Hall
10/8/51
G.V.
II*
House. c.1610. For Theophilus Ashton. Dressed stone, hammer-dressed stone and graduated stone slate roof. 5 x 3 bays with 2 storeys (plus attic level) all raised above a…
SD 91 SW MILNROW CLEGG HALL ROAD (south side)
3/85
10/8/51
G.V. II*
House. c.1610. For Theophilus Ashton. Dressed stone, hammer-dressed stone and graduated stone slate roof. 5 x 3 bays with 2 storeys (plus attic level) all raised above a full…