"Item Id","Item URI","Dublin Core:Title","Dublin Core:Subject","Dublin Core:Description","Dublin Core:Creator","Dublin Core:Source","Dublin Core:Publisher","Dublin Core:Date","Dublin Core:Contributor","Dublin Core:Rights","Dublin Core:Relation","Dublin Core:Format","Dublin Core:Language","Dublin Core:Type","Dublin Core:Identifier","Dublin Core:Coverage","Item Type Metadata:Lesson Plan Text","Item Type Metadata:Bibliography","Item Type Metadata:Biographical Text","Item Type Metadata:Occupation","Item Type Metadata:Death Date","Item Type Metadata:Birthplace","Item Type Metadata:Birth Date","Item Type Metadata:Participants","Item Type Metadata:Event Type","Item Type Metadata:URL","Item Type Metadata:Bit Rate/Frequency","Item Type Metadata:Interviewer","Item Type Metadata:Interviewee","Item Type Metadata:Location","Item Type Metadata:Transcription","Item Type Metadata:Local URL","Item Type Metadata:Original Format","Item Type Metadata:Physical Dimensions","Item Type Metadata:Duration","Item Type Metadata:Compression","Item Type Metadata:Producer","Item Type Metadata:Director","Item Type Metadata:Text","Item Type Metadata:Time Summary","Item Type Metadata:Email Body","Item Type Metadata:Subject Line","Item Type Metadata:From","Item Type Metadata:To","Item Type Metadata:CC","Item Type Metadata:BCC","Item Type Metadata:Number of Attachments","Item Type Metadata:Standards","Item Type Metadata:Objectives","Item Type Metadata:Materials",tags,file,itemType,collection,public,featured 32192,https://penninehorizons.org/items/show/32192,"Wetherby Station - DNT00152","Bridge, Footbridge, Lamp, Leeds, NER, North Eastern Railway, Passengers, Platform, Railway, Railway station, Railways, Station, Station Building, Station Platform, Train, Wetherby","Seen here early 20th century on the NER’s Cross Gates – Wetherby line. This is the second station in Wetherby the first having been on the Church Fenton- Harrogate line but when the line from Cross Gates opened in 1876 it’s junction with the Harrogate line was beyond the station meaning that Leeds – Harrogate services by-passed the station. Consequently this new station was built but not until 1902 and it closed with the line in 1964.",Unknown,"David Taylor","Pennine Horizons Digital Archive",,,"PHDA - David Taylor Collection",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Bridge,Footbridge,Lamp,Leeds,NER,North Eastern Railway,Passengers,Platform,Railway,Railway station,Railways,Station,Station Building,Station Platform,Train,Wetherby",https://penninehorizons.org/files/original/bdc7dc8f19b24941c42ce5c658f5728f.jpg,"Still Image","David Taylor collection",1,0