The store had been subjected to flooding on several occasions so this new design has car parking at the ground floor level with the store above. Here 16th april 2018 construction is almost complete.
The store had been subjected to flooding on several occasions so this new design has car parking at the ground floor level with the store above. Here 16th april 2018 construction is almost complete.
Stubbings Steps from School Street down to Commercial Street. The building at the bottom was originally the toll bar house on the Leeds and Hebden Bridge Turnpike Road. This picture, taken in c2015, is a reconstruction of the picture, taken in the…