Constructed in 1898 as a compensation tunnel for Green Withens Reservoir, one of the former Wakefield Water Board’s biggest holdings with a capacity of over 300 million gallons, the tunnel runs back for 850…
27th Aug, 1938. Fred Barker, Bottomley (surveyor), Fred Hodgson, G.W. Sutcliffe, Milton Sunderland, G.H. Walton, Tom Sunderland (Treasurer) Arthur Sutcliffe.
Undated postcard. One of the 15 engines used during the construction of the reservoirs at Walshaw Dean for Halifax Corporation. Work started in 1901. As well as transporting supplies and materials the railway was also used to transport the navvies…
Valve-tower for Widdop Reservoir constructed 1872-1878 by John La Trobe Bateman engineer. Large ashlar blocks, bitumen roof. Square on plan with tapering sides. Egyptian in style. Door to south has monolithic jambs with batter. Corners…